FAForever Forums
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Login

    Was this a cheat or what ?

    Scheduled Pinned Locked Moved General Discussion
    7 Posts 7 Posters 544 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • H Offline
      Hendrik_SpecialF
      last edited by

      I clearly thought these would cost 40 mass, Double the price.

      IMG-20180523-WA0001.jpg

      1 Reply Last reply Reply Quote 0
      • ? Offline
        A Former User
        last edited by

        This post is deleted!
        1 Reply Last reply Reply Quote 0
        • J Offline
          JazzFunkNoob
          last edited by

          The drain of Nukes sometimes flickers to 80M/s. I don't know why but it is common.

          1 Reply Last reply Reply Quote 1
          • CaptainKlutzC Offline
            CaptainKlutz
            last edited by

            my probably incorrect assumption is that when a nuke is being assisted, whenever the assistance provides enough bp, it temporarily doubles the nuke build speed for a tick to accelerate its progress. there is no actual nuke unit being built so i believe this is how the code spaghetti works

            1 Reply Last reply Reply Quote 3
            • arma473A Offline
              arma473
              last edited by arma473

              When engineers assist a nuke launcher, the engineers have an energy cost, but no mass cost.

              The mass cost for the assistance is in the nuke launcher itself. That's why it goes up from 40 to 60 to 80 etc. depending on how much assistance.

              This also means: engineers assisting a nuke can take advantage of the nuke launcher's adjacency to mass fabs. If you ring a nuke with 4 T3 mass fabs, the missiles cost half as much mass. EVEN IF you have 100 engineers assisting it. That's why I like to make 4 fabs + 1 nuke +50 engineers assisting. You get fast nukes at half price.

              Edit: Also, the T3 mass fabs have to be completed and I think they have to be running (not power stalled) when you START making the nuclear missile, in order to get the adjacency bonus. After the missile starts making, you continue to get the full adjacency bonus until the missile completes, even if you power stall.

              1 Reply Last reply Reply Quote 0
              • C Offline
                clyf
                last edited by

                I thought the mass cost showed zero because the build cost was so high that whatever fraction of 1 mass the engineer was spending got rounded down to zero? But I know missile build mechanics are strange, wouldn't be surprised if that assumption was wrong.

                M 1 Reply Last reply Reply Quote 2
                • M Offline
                  Mnaisoa @clyf
                  last edited by

                  This post is deleted!
                  1 Reply Last reply Reply Quote 0
                  • First post
                    Last post