Appears to not be the case.
uel0105/Engineer
build rate/mass cost: 0.09615384615384616
uel0208/Engineer
build rate/mass cost: 0.1
uel0309/Engineer
build rate/mass cost: 0.10416666666666667
Academically I'm interested in why you should have 100 t1 engineers building in your base.